GPS Tracker Magnetic Mount Real-Time Location Movement Alerts
Free US Shipping
Almost out of stock
Stop Wondering Where Your Valuables Have Gone
Track valuables in real time and monitor movement — smartphone GPS updates, instant alerts, remote audio, magnetic mounting without installation

Why This GPS Tracker Is Perfect for You
✔ Live location updates: Check the tracked item's real-time location on a smartphone app for iOS or Android. Keep tabs on vehicles, luggage, equipment, bikes, or other belongings from anywhere.
✔ Instant movement alerts: Receive a notification as soon as the tracker detects movement. Get a timely warning if a vehicle or valuable item is moved while unattended.
✔ Quick magnetic mounting: Attach the compact tracker to a metal surface in seconds using its magnetic mount. No drilling or installation is needed, and its operating range of -4°F to 158°F supports use in varied conditions.

Specifications
Dimensions: 1.62 × 0.54 in
Frequency: 850, 900, 1800, 1900 MHz
Operating temperature: -4°F to 158°F
Power source: 3 V lithium coin cell battery
What our customers have to say:
Luvilea Guarantees
Rated 4.6 / 5 based on 1289 reviews. Showing our 4 and 5-star reviews.

