GPS Tracker Magnetic Real-Time Location & Motion Alerts
Free US Shipping
Almost out of stock
Stop wondering where your valuables have gone
Locate valuables from a smartphone in real time — live GPS updates, movement alerts, and remote audio monitoring; magnetic attachment without drilling or installation.

Why Is This GPS Tracker Perfect for You?
✔ Live GPS location updates: Check a tracked vehicle, bag, or other valuable through the smartphone app, with real-time location updates sent to iOS and Android devices. Know where items are without relying on occasional manual checks.
✔ Instant movement alerts: Receive an alert when a tracked item starts moving. These timely notifications can help flag unexpected movement and make it easier to respond when a vehicle, bag, or piece of equipment may be at risk.
✔ Compact magnetic attachment: Attach the compact tracker to a metal surface in seconds using its built-in magnet, without drilling or installation. Its durable ABS construction and operating range of -4°F to 158°F support use in varied weather conditions.

Specifications
Material: ABS plastic
Dimensions: 1.62 × 0.54 inches
Frequency: 850, 900, 1800, 1900 MHz
Operating temperature: -4°F to 158°F
What our customers have to say:
Luvilea Guarantees
Rated 4.6 / 5 based on 1289 reviews. Showing our 4 and 5-star reviews.

